US$ 29.00
Speed dependent detonator explosion
Many plants were located alongside waterways
backup lights
On - Cold Engine Start
5 metres of PowerBase centipede plates
376-201A LNER Thompson First Corridor BR Crimson & Cream E11174E 2019-Range Speed dependent detonator explosionEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
US$ 29.00
US$ 22.95
US$ 22.95
US$ 22.95
US$ 28.95