US$ 100.00
these were a standard design of loco coal wagon (diagram 207)
with many of them surviving into BR days in both revenue and Departmental service
A set of men in white painters overalls
3 3 aspect home standard T junction signal kit square head
A small modern industrial unit perfect for an industrial park
4P-020-111 GWR Toplight Mainline City Lined Chocolate & Cream All Third 3903 Set 2 BR-Livery these were a standard designThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 100.00
US$ 22.00
US$ 72.00
US$ 133.00
US$ 29.99
US$ 24.59
US$ 94.99
US$ 19.00
US$ 36.99
US$ 23.99
US$ 16.00
US$ 38.50
US$ 27.50
US$ 24.00
US$ 50.00
US$ 16.00